A claim is useful only when the order can support it.
We separate general capability from project-specific certification. Materials, production location, documents and inspection requirements are confirmed before a compliant order is accepted.
The approved sample is the operating reference.
Construction, materials, colors, branding and key workmanship points are confirmed before production. Inspection requirements are matched to the product and buyer program.
- Pre-production alignmentApproved sample, specification, artwork and packing requirements are reviewed together.
- In-process controlCritical workmanship and assembly points are checked while production is running.
- Final releaseAppearance, function, quantity, needle detection and packing checks are applied as agreed.

GRS Scope CertificateCertificate: IDF-25-859882TE-ID: TE-99971130
Valid to Sep 22, 2026View watermarked certificate
Valid to May 22, 2027View verified recognition
Certification scope is checked per order.
Our current GRS scope covers selected bags, handbags, pouches, totes, cleaning cloths and packing bags manufactured at the certified site. For qualifying orders, we can source certified inputs, maintain the required production records and apply through our certification body for a Transaction Certificate covering the finished-goods shipment.
End-to-end TC preparation must be planned before production. Incoming supplier TCs, approved materials, product scope, certified site, buyer details and shipment records must remain aligned. The certification body issues the final TC after review.
What can be prepared for a qualified project.
Certificate review
Current scope and material route reviewed against the planned product and production site.
Customer-specific audits
One production site is prepared for customer and compliance-driven audit programs.
Production-site alignment
Orders with site, audit or certification restrictions are planned only through the accepted route.
End-to-end TC preparation
Incoming TCs, material use, production records and shipment details are aligned for the certification body's finished-goods TC review.
